| Simonetta ARE 110 Turbine Installation / DSCN5087
Steve Waller 7/4/2006 This is a critical stage of the raising. It is crucial to ensure that the tower does not buckle and the top does not bounce past vertical. There is a rope on guy wire #1 and a hold back cable we control separately on guy wire #3. As you can see, the tower is very straight... Perfect! Steve@UPWallers.net |
