| Simonetta ARE 110 Turbine Installation / DSCN5071
Steve Waller 7/4/2006 Temporary bracing holds up the tower so that work could be done. The vertical pole in the background is the "gin pole" used to pick up the tower. Steve@UPWallers.net |
