Simonetta ARE 110 Turbine Installation / DSCN5071
Steve Waller
7/4/2006
Temporary bracing holds up the tower so that work could be done. The vertical pole in the background is the "gin pole" used to pick up the tower.
Steve@UPWallers.net

DSCN5071